How to Install WRB House Sheathing (ForceField).




How to Install Laminate Flooring for beginners

Load more...

.

The installation of the wall panel of the sheathing equipment will become the element of the case Prepare the wall to connect ö vinyl siding Whether it’s an old house or a new house, wood, brick, aerated concrete or reinforced concrete, the foundation of vinyl siding can be the perfect plane of existing wooden walls, or it can be installed on these walls with wooden strips or metal profiles Slats. However, if additional insulation is planned for the house, a lathe will be the only option for connecting the wall panels and insulation. Your house does not require lathe equipment, so when installing the siding, you only need to remove all the protruding parts-drains, drainage systems, platform belts, electrical and plumbing communications. Next, it is necessary to impregnate the wood base with a flame retardant compound. If you install the siding without installing the siding, you will reject the ventilation gap between the inner surface of the siding and the bottom of the house that many experts recommend. It will not be superfluous to lay a windproof film between the wall panel and the base.
old
For this, wood or block as well as metal profiles are suitable. In any case, the slats should be installed in steps of 31 to 41 cm, and the wooden elements of the slats should be dried and impregnated with the flame retardant composition. The optimal slat width is 71 mm and the thickness is 21-26 mm. Where the siding will be installed horizontally, the lathe is installed vertically, and where the siding will be installed vertically, the lathe is respectively horizontal. When door panels are used to cover the slope of windows and doors, the slats should be arranged perpendicular to the door panels with an increment of 21-31 cm. The thickness of the insulation material should be considered when installing the insulation material. The distance from the base of the installation slat to the outer surface of the wood or metal profile must be at least the thickness of the insulation material + 21-31-for the ventilation gap. Also, don't forget to protect the insulation from the inside Prospect Park with moisture-proof materials, as moisture will destroy many materials and provide wind protection from the outside. The gables and eaves of the roof are not finished with ordinary siding but with soffits. The soffits are no different from ordinary panels in appearance, but are intended to be installed on overhangs or ceilings. The lathe of the spotlight is performed in the same way as the siding. They are placed strictly vertically, which can be done using plumb lines, construction (bubble) levels or laser levels. In addition, pull a rope from corner to corner and install the remaining elements of the crate along the rope-thus realizing the ideal plane for the future wall decoration layer. In order to adjust the indentation of the slats from the base, plywood liners and slats sawn into short boards were used. To fix the lathe board to the base, you need to use the required length of self-tapping screws-if installed on a wooden wall. Self-tapping screws with pins and anchors are used to construct slats on brick, concrete and aerated concrete walls.
The technology of the lathe device made of metal profiles is roughly the same, only using metal profiles instead of rods, and cutting or sawing the same metal profiles to the required length for filling indentations. When preparing a wall of vinyl siding, a so-called mortgage should be installed. This is necessary because the wall panels are not intended to perform load-bearing functions. How to Install Laminate Flooring for beginners