How to Recycle Styrofoam Coolers.
Cheap DIY $2 Grow Tent!
Load more...
.
However, if you have studied all the nuances of the process, you will not have any difficulties during the installation process. Moreover, you can save a lot of money in this way. In most apartments, there are no quarter openings. Generally prevent windows from falling and strengthen the structure.
If there is no quarter, install the frame on the anchor bolt and cover the foam with a special strip. Determining the existence of a quarter is very simple: if the inner and outer widths of the frame are different, there is still a quarter. It is recommended to remove the plaster to make the results more accurate. The measurement must be repeated several times with minimal results.
To determine the width of the window, subtract two installation gaps from the width of the opening. To determine the height, subtract the same two gaps plus the height of the bracket profile from the height of the opening. To determine the width of the drain pipe, add a 5 cm bend to the existing drain pipe. It also takes into account the width of the insulation and cladding (depending on the subsequent finish of the exterior wall).
The size of the deviation is added to the width of the opening, and then the width of the frame is subtracted from the resulting image. Regarding the deviation, it should overlap with the radiator by one third.

After the measurement, the finished drawing should be given to the window manufacturer, where all necessary accessories will be selected.
In the first option, you will have to pull the bag out of the frame, insert it into the opening, and install the glass back. In the second case, the entire structure is fully connected. Each option has its drawbacks-if you pull out the packaging, you may damage it. The reverse is also true. If the windows are assembled well, they may be damaged due to excessive weight. 
This installation phase only begins after the ordered window has been delivered. First, the workplace is empty, and all furniture is covered with plastic wrap (there will be a lot of dust).
To do this, use staples to slightly pry the glass beads apart and pull them out. First, remove the vertical glass beads first, and then remove the horizontal glass beads. They must be numbered, otherwise a gap will be formed after installation. In addition, the frame is slightly inclined and the glass is removed. After removing the plug from the awning, unscrew the bolt. The handle is opened (in the middle), the window opens slightly and then moves away. Only keep fake frames. These are special jumpers used to divide the leaves.
Then you need to mark the anchor and punch holes along it-two at the bottom/top and three on each side. This requires an anchor of ø1 and a drill of the required diameter. If the wall is made of loose material (for example, porous concrete), use anchor suspension to fix it. The latter should be fixed to the wall and frame using hardened self-tapping screws (eight each). In order to avoid the formation of thermal bridges on the contour of the window sill, it should be filled with polyurethane foam one day before installation. Therefore the element will not freeze.
It is recommended to perform this step immediately before installing the new window. In most cases, old things will be thrown away, so the structure can be torn off along with the mount, and the frame can be sawn if necessary. 
For this, it is best to use a hammer drill with appropriate attachments (called attachments).
The window sill was removed, and the cement layer under it was peeled off. By the way, many installers will forget it). In the case of wooden openings, lay a layer of waterproof material around the perimeter.
It can be installed at a temperature not lower than -16ᵒС. The polyurethane foam must be frost-proof. First, place the wooden wedges on the entire perimeter, and then install a window on it (this makes the structure easier to align) until it is fixed to the wall. You can keep the backing for other fasteners. The lack of a supporting profile can be considered a serious violation of the standard because not only stability is required, but also landing gear with bay windows can be installed. In the absence of profiles, they are directly connected to the frame, which violates the airtightness of the frame. Sol's Groza (ąž) Sol's ė Klaipedoye (ė) professionals, Sol (ė) is energetic.
The correct position of the bracket outline is shown in the figure.
In addition, check the uniformity of the window on the three planes, and use installation levels and plumb lines for this purpose. The traditional bubble level is not suitable for this because of insufficient measurement accuracy, so it is best to use a laser level.
If the window rises evenly, fix it with an anchor. To do this, drill a perforator in the wall through a pre-prepared hole in the structure (approximately 6-11 cm). Anchor and fix (not completely fixed), check the flatness of the package again, and then connect the remaining points. The final screed is performed only after the final inspection. Don't screw it too tight, or it will design. 
On the outside, the outflow hole is fixed to the support profile by self-tapping screws. The joints are carefully sealed with sealant to prevent moisture from penetrating into the structure. The edge of the low tide is recessed a few centimeters in the wall, and the recess has been made with a perforator before. 
It is recommended to use a piece of sound insulation material (for example) to glue the lower part of the low tide, or use polyurethane foam to reduce the sound of rain.
The latter should click into place, for which you can tap them lightly with a rubber mallet. If you lay the window flat, the sash cannot be closed.

Polyurethane foam will provide high-quality waterproof performance and prevent glass fogging. Before and after sealing, spray the joint with water to improve polymerization. If handled correctly, foam will appear a few centimeters after drying. The windows are glued with special moisture-proof tape, and materials with a foil surface are used from below. The door sills are trimmed to fit the opening while keeping close to the contour of the liner. There is still a small thermal expansion gap (about 1 cm). In the future, the gap will be hidden by the plastic slope. It must be slightly tilted toward the room, and then smeared with a heavy object for a while, until the foam dries. In addition, the window sill can be fixed with a fixing plate.
Now you know how to install plastic windows, so you can start working safely. The final inspection of all components can only be carried out 25 hours after installation (then the foam narrows). 
The described technique is very suitable for glazing in balconies, although there are some subtle differences-for example, installing guardrails to create partitions.
Learn how to use your own hands to tilt the window correctly from our new article. -ų ų š ų ž š ą. Price of polyurethane foam and cleaning spray gun cleaner, stage 6, drainage stage 7. window assembly, stage 8. Cheap DIY $2 Grow Tent!